Refresh Timer Exception Phase=5

Subscribe to Syndicate

This has been an on-going problem with the Digital Dome Works ASCOM driver.  This error loses connection between the dome and ACP and leaves the dome in an unsafe condition. Not suitable for automated imaging.  There has been a new ASCOM driver in the works for quite some time now.  If a new driver doesn't come out soon, I'll have to like at getting an alternative (more expense) dome control system such as MaxDome.

In the meantime, I've registered at the developer's web site to provide feedback and hopfully hurry things along. See: http://jira.teamserver.tigranetworks.co.uk/